这是在顶柱稳定性分析时发展出来的一个数据集,总结了Mount Isa Mines从1970年代至今50年的岩石力学研究,包括应力测量、工程岩体分类、岩石破碎、采矿方法的变迁、岩石支护方法等。Mount Isa Mines是澳大利亚最大的地下铜矿,由Glencore公司拥有,目前使用的主要采矿方法是分段崩落法,开采深度接近2000米。
Mount Isa Mines分段崩落法和岩体节理测绘
(1) (1970) Diamond drilling for structural purposes at Mount Isa
(2) (1970) Excavation design in hard and fractured rock at the Mount Isa Mine
(3) (1971) Cemented Fill Practice and Research at Mount Isa
(4) (1976) Monitoring of Stress, Strain and Displacement in and Around a vertical Pillar at Mount Isa Mine
(5) (1976) Stress measurement in a bored raise at the Mount Isa Mine
(6) (1977) An analysis of rock behaviour in an experimental stoping block at the Mount Isa Mine
(7) (1977) In situ investigation of cemented rockfill in the 1100 ore body, Mount Isa Mine
(8) (1982) Numerical modelling of the yielding 11-level crown pillar at Mount Isa
(9) (1983) Development of a fragmentation monitoring system for evaluating open slope blast performance at Mount Isa Mines
(10) (1983) Cable support of lead open stope hangingwalls at Mount Isa Mines Limited
(11) (1989) Fill research at Mount Isa Mines
(12) (1992) Ground support investigations and practices at Mount Isa
(13) (1996) Rock mass characterisation of the George Fisher deposit from borehole data
(14) (1998) Rock Mechanics Principles for Open Stope Mining at Mount Isa Mines
(15) (2000) Mount Isa Mines - 1100 Orebody, 35 Years On
[1] Rock mechanics of crown pillars between cut-and-fill stopes at Mount Isa Mine
[2] Application of various rock mass classifications to unsupported openings at Mount Isa, Queensland: A case study